Working from an existing outline specification, OCC carried out a survey from a cherry picker and developed a detailed schedule of works that interpreted the overall aims of the project into practical proposals. This included preparing drawings showing mortar repairs and stone replacement as well as other works such as pinning, leadwork and shelter coat.